Wednesday, April 22, 2015

Construction 24/7



The day has grown bigger and work goes on until late! With Rafa here we take advantage of this and usually stay until sunset, also we are running now to meet ESPA deadline of 30 June!!! and to be open for our firts visitors in July!!!



A beautiful spring day on the plot

















I just love days like this! Everything is green, blue and bright, the stream is full of water and we can hear it running and the birds are singing, its spring at last!

Saturday, April 11, 2015

Stone plates

We started our first expierience with laying stone plates. First attempt was to lay them in mud with this simple but time consuming technic we realized a pathaway and an sitting area under the mulberry tree at the small house. The second technic was to lay them into mortar. Its quiet a bit faster and much easier to level them to each other.


Thursday, April 9, 2015

Monday, February 23, 2015

Winter Timelapse


filmed with:Gopro3
filmed by Nicolas Bedau
edited by Nicolas Kantuser
License: CC

The First to come


A million thanx go out to Joni the first who came, stayed and worked with us........for our dream. We will always remember the nice 3 months you spend with us. All the input to the project or how you would call it "company" lol......lets see what we can make out of it.

Sunday, February 22, 2015

Rain Water Cistern of 100.000L



The cistern is the central part of our fresh water management, it stores the winter rainfall that is collected trough out all hard surfaces like roofs, verandas and stairs that we created through out the building process. This area ads up to 281 sq m with an average 380 mm of annual perception (rainfall) the water that will be collected is around 100.000 L (100m3). This amount of water can provide all needs of the Ecolodge trough out the 4 dry Summer months.
In August the excavation started(pic.1) and we extracted about 30% of the stones we used for our buildings. After leveling the ground the wood shuttering for the concrete was put up(pic.2). Concrete was poured in September and the Greek magicians managed to make floor and walling in one run(pic.3-4). Iron reinforcement was put in place for the roof that also is making up the veranda of the one house(pic.4-6). Cleaning out all the mud, irons and water in the dark was a hell of a job. Finalizing the veranda (roof) surface with the power trowel and color worked out fine(pic.7-9). Finalizing the inner part of the cistern took us quite some time because all loose parts like wood, mud and nails had to be removed before the water impregnation could start. We used a cement based sealing slurry for drinking water quality, in 3 passes(pic.10-11).    
At the moment water level is continuously raising with 50cm in 22.Feb.2015

     

Tuesday, February 10, 2015

Slow down with the weather


The weather finally permitted us to finish the roof and the terrace of the small house and the last wall of the big house. Now its time to construct the mold for the roof of the big house. We also started the drainage canal around the small house and we are preparing the molds for two more terraces. This winter is raining a lot which is good for the island but hard for the construction site....and we are left with only 3 workers, so things are going pretty slowly...the race for finishing in June for the ESPA funding will be hard, but we are still optimistic!!

Friday, January 30, 2015

Snow in Tinos!

The beginning of 2015 was full of surprises. A snow stormed arrived that reached unbelievable heights that locals never remembered again! Roads were blocked, electricity was cut off for 3 days and also water. The landscape was magical but people suffered from cold and lack of water. Luckily we had minor damages in the ecolodge, on the island some trees were broken, plants, cultivations and also animals suffered and drywalls fell down. 

Access to ecolodge was possible only by foot
 

  
 

The view from ecolodge with snow

Wednesday, December 31, 2014


Marilia, Rafael, Ronan and Nicos wish all of you the very best for the coming year. Special thanks go out to Joni, Martin and Niki who stayed with us and made us laugh, enjoy and helping us getting on with a million jobs.

Sunday, December 7, 2014

Some Panoramic impressions


Our progress so far....... we still have nice weather with temperatures around 18 C during the day and working outside is still fun. At the moment we finished the small utility house (house in the middle), that will host all of the equipment that is needed for the supply of water, electricity and commonly shared things like washing machine etc. The small house (upper house) has a roof that is curing out for the next 15 days in order to get the supporting scuff holding out. After that we will start with the windows to close the house up and begin with the inside construction. The big house (lower one) is missing one outside wall that due to a change in the building permit is waiting now for 2 months to be constructed. Hopefully in the next week bureaucracy will move on........

Monday, December 1, 2014

TIP: Power trowel


The power trowel works on medium wet concrete surfaces. After finishing you get a very durable hard surface in what ever color you want. For us it was great to find out about the little machine, we saved a lot of material, time and money.

Roof is coming


So last week we finished the roof construction of the small house and the veranda in front of the house.

Saturday, November 15, 2014

Big house progress


Big House day 3

Big house day 4





Big house day 5


Big house day 8



Big house day 9




Camping in winter

Camping is still going on during winter. Even in November, with the temperature going up to 20 degrees during the day and not under 15 the coldest night, Jonathan and Ronan mostly and Nico and me, we are still sleeping there, cooking and making a fire at night to warm up.
Its also amazing how green everything is turning again and its wonderfull every morning to get up with the sunrise! And the noise of the workers!


We've got company!!!

Four female little doggies just arrived under our plot one day! Of course someone abandoned them there to get rid of them, thinking maybe that we would like to keep them.... Well what to do with 4 dogs??? Fortunately George and Stefanos, two of the stone workers with a bit of pursuasion they got one each. Then we started to like having them around, they could be also of some use at the plot, like chasing the goats away!! So we kept the other two....

Saturday, November 1, 2014

Social Media

We decided, after some discussions, to contribute also to the social media sites:

 

https://www.facebook.com/pages/Tinos-eco-lodge/1460675304203102 
https://plus.google.com/u/0/111036111081628064904/posts

 Google+
 

Autum Timelapse of construction


filmed with:Gopro3
filmed by Nicolas Bedau
edited by Nicolas Bedau, Marilia Kalouli, Ronan Lewis
Musik: Bmccosa License: CC

Sunday, October 26, 2014

The small house 45m2 was up in 11 days!

The small house as you see it, without the roof, was finished in 11 days. The time span was amazing. In this speed we managed to make all the necessary preparation for electrical installation, plugs and switches, and on the spot decide were to make shelves inside the wall.The stairs also connecting the small house to the Utility were made really nice and comfortable to walk on by the two workers from Agapi.

Thursday, October 23, 2014

The pig

After 3 weeks the stone walls of the Utility house and the small house are ready! Time for a small celebration. George Clooney from Albania killed the pig, Stefanos and Petros brought their own homemade wine from Agapi and the fire is on!!! The pig was delicious!!!and the wine sweet, the kitchen has moved inside the valley and everyone really enjoyed it. The next one will be the wild goat.

Sunday, October 5, 2014

Stone building has started!

The small house 1st day of building.
The most fascinating phase has started. The stone builders of "Xatzis" firm were chosen between several different offers. We started with the utility house to check their technique and make adjustments.  7 workers have come and in 6 days the Utility house was up! They are so fast that it was difficult to keep pace with them and some things were missed!  Read in the construction page more details about foundation waterproofing, drainage walls and electrical installation.

The utility house was up in 6 days!

Thursday, September 11, 2014

Concrete bloody concrete


After one month preparation the  big moment has arrived! All foundations were ironed, tubes were placed and fixed real tight in position, electrical installations also, final leveling was adjusted and the concrete is poored. We were really anxious that the tubes would not move from the concrete force and luckily everything went well! 10 concrete trucks arrived and brought a total of 66 cubic meters of concrete all the way from Tinos to Potamia / Akeratos.

I have to say that concrete is not our favorable material, but license is not given for rock foundations anymore for new houses, and the cistern could not be constructed otherwise. However, the stone stables that are already there since 1955 and before will be repaired as they are, keeping all the traditional methods and techniques!



The cistern of 10 x 5 x 3 meters high was the most demanding. First the floor had to be filled in and after the walls. Trucks were coming loaded one after the other, a total of 40 cubic meters were thrown in there!










             




The concrete is spread evenly and the tubes are covered and they look quite alright!!! The pooring was done very carefully not to put pressure directly on the tubes and hopefully the 5 degree slopes have stayed in place...


Vidos and Nikos are trying out the helicopter machine! The wings make the surface smooth and even, covering small holes, deleting bumps and if you know exactly how to do it you could have a ready floor in the end! We will try to achieve that by the time we reach the cistern roof which is going to be the exterior veranda of the big house. In the meantime we are practising...