Thursday, August 28, 2014

The construction site is on

Yes, finally we got most of the paperwork done and started on the 27.7.14 the construction on site!!
We decided to move into tents on the plot in order to get a better impression of the work and of course to make the 6:30 morning shift easier.
So after the first weeks here are some impressions on what we are doing and how it looks like.
The first thing to start with was the excavation for the foundations of the two houses, utility house and cistern .....a lot of rock, a lot of dirt and a big mess.
While the big machines did their job we started fixing some of the broken dry stone walls, although a back breaking job, it gives direct satisfaction caused by immediate result.
After the first excavation the molds for the foundation slabs were constructed and the iron was installed.
Through the planning process we had decided to get all installations like fresh water, grey water, black water and electricity into the concrete foundation, so we installed like a million pipes.......
So at the moment the whole for the huge cistern of 100 cubic meters is molded and we had the first official control, everything came out smooth till now.
So greetings to all of you reading this!

Ps: Time-lapse videos of the work are in preparation!


Wednesday, May 7, 2014

Final designs of the stone houses



 
Hello everyone! Finally we have our house designs ready for committing to the Architectural committee of Tinos on Friday!!  We have been working hard the whole past month, making  hundreds of changes on the way, taking into consideration your thoughts and comments and we hope we have found a nice solution! Check the Design Process page for close ups of the two houses and leave your comments! We hope you like them!

Friday, April 4, 2014

Plot arrangement



This is a first drawing of the general plot arrangement. Its very difficult to place everything on the right spot! Many things have to be considered: like access to the houses and terraces, entrance and parking space, connections of places, as well as plants and wind direction, as well as all the technical details of water collection and treatment. Then the orientation and the natural phenomena, north face-windy, east side- sea view, west side- sunset light. So still working on it but a first arrangement is presented.

The entrance with the parking is on the right under the big stone stable. From there two separate footpaths lead to the terraces with the houses as well as the middle terrace which leads to the small stone stable which has been transformed to the utility room, with all batteries for solars, water filters, pumps will be gathered. There is a big cistern of 100 m3 constructed at the lower level with a small pergola and an open space above it. This can be used as a common area for morning yoga or other activities. The reedbed which collects all the sewage liquids is constructed on the left upper terrace with a collection tank of the filtered water under it next to the cistern. Solar panels as well as hot water solars are placed on the roofs, as low as possible so not to be visible.
Upper left terraces are planted with trees while their more wind protected and right upper terrace with local vines which crawl on the ground thus are wind tolerant. The middle terrace will become a herb garden with all local species of lavender, thyme, oregano but also wind resistant rosemarine. Oak trees that are growing on the field will be wind protected by stone walls so they can grow straight and hang a hammock underneath! At the old "aloni" which is the round stone construction where they processed the wheat with the animals, a rock cactus garden can be planted. Next to the two stone houses a small fresh herb garden with parsley, basilicum, anise etc will be planted near the kitchen. The big vegetable garden with all kind of tomatoes, cucumbers, aubergines, courgettes etc will be a little further, not placed yet, but to the left side of the field where it is totally wind protected!


Saturday, March 22, 2014

Location map

We just added a interactive google map on the Project page. So you can see where we are....

Wednesday, March 19, 2014

Design process

Check the new page with all the different designs that we have made so far and tell us which one you prefer!
At the moment we are trying to design the stone buildings that will be constructed. We would like to get some opinions and ideas on the designs examples, from you. So if you are interested give some thoughts and two votes for your favorite in the comments on the blog (its open for all, if you like with name).

Saturday, March 1, 2014

The location


The plot is located in the East side of the island,  2,7 km going down from the village Steni to the beaches Santa Margarita and Lychnaftia.

After nearly three years of on going search for a nice piece of land, also affordable, we found this great spot, which contains also 3 very old traditional stables made of stone, and many big old oak trees!! which is amazing for this arid Aegean island. At its west side it almost borders a small river stream with big Platanus trees and other riverside vegetation which makes this place amazingly green and wild.



 direction to the north
direction to the north-west

direction to the east

 direction to the south-east

Hallo People,
this Blog will discuss and illustrate the evolution in the design and co working progress of the eco friendly touristic destination Ecolodge Tinos (Greece).
The core subjects of the Blog will have technical character in the field of regenerative energies, recycling of resources and eco friendly building materials. Around the core there will be discussions and ideas about ecology and a group orientated planing and design process.

The Ecolodge team